Menu
BRISBANE RIVER AND PINE RIVER FLOOD STUDIES : PINE RIVER SYSTEMS HYDRAULIC MODEL VOLUME 3
DETAILS
TitleBRISBANE RIVER AND PINE RIVER FLOOD STUDIES : PINE RIVER SYSTEMS HYDRAULIC MODEL VOLUME 3Alternative titleINTERIM REPORT ON NORTH PINE DAM DAM BREAK ANALYSISPersonal authorDepartment of Primary Industries South East Queensland Water BoardImprint[s]: ? 1993LanguageEnglishDate1993Collation115p. tables.Bib. formatBooksNotesHeld in Local Studies Collection for reference only.
ACCESS LINK
Find in the libraryLink to library catalogue
IDENTIFIERS
Library of Congress (keywords)Flood control -- Queensland -- Pine Rivers ShireNorth Pine Dam (Pine Rivers Shire, Qld.)
BRISBANE RIVER AND PINE RIVER FLOOD STUDIES : PINE RIVER SYSTEMS HYDRAULIC MODEL VOLUME 3 (1993). Moreton Bay Our Story, accessed 02/04/2026, https://ourstory.moretonbay.qld.gov.au/nodes/view/14072







